JOB Pertamina – Medco E&P Tomori is joint operating body between PT Pertamina Hulu Energi and PT Medco E&P Indonesia.
We are one of the national oil & gas companies based on Jakarta, Indonesia. Our project in Central Sulawesi offshore (Senoro) has been operating since February 2011. We are currently inviting highly dynamic, self-motivated and committed applicants.
To apply several positions in a challenging work environment as follow:
Mechanical / Piping Field Construction Engineer
(Sulawesi)
Responsibilities:
- Control, review, check, inspect and supervise construction activities, especially in mechanical / piping work.
- Analyzing on lifting of heavy equipment installation.
- Resolves any contractual/legal matters and takes action.
- Analyze exposure to risk and quantify potential for losses.
- Interface / mediate between various engineering disciplines and departments.
Requirements:
- Candidate must possess at least a Bachelor s Degree in Mechanical / Chemical Engineering.
- Min. 10 years in construction of oil-gas facilities, involving.: piping fabrication, installation work, welding and its inspection on piping work, mechanical installation work, lifting of heavy equipment installation, etc. Engineering Consultancy or EPC company in Oil & Gas sector).
- Understand standard engineering specifications, Oil & Gas process codes and applicable international codes, i.e.: ASME, API, ANSI, AWS, etc.
- Demonstrate knowledge of various engineering discipline.
- Familiar with project specifications.
- Familiar with safety and environmental requirement.
- Familiar with reporting system.
- Speak and write English in good proficiency.
Instrument Field Construction Engineer
(Sulawesi)
Responsibilities:
- Control, review, check, inspect and supervise construction activities, especially in instrument work.
- Resolves any contractual/legal matters and takes action.
- Analyze exposure to risk and quantify potential for losses.
- Interface / mediate between various engineering disciplines and departments.
Requirements:
- Candidate must possess at least a Bachelor s Degree in Physical Engineering.
- At least 16 years of working experience in the related field is required for this position (Min. 10 years in construction of oil-gas facilities, involving.: GTG assemble, Switchgear, UPS, DCS, ESS, SCADA installation, etc. Engineering Consultancy or EPC company in Oil & Gas sector).
- Understand standard engineering specifications, Oil & Gas process codes and applicable international codes, especially construction of upstream facilities.
- Demonstrate knowledge of various engineering discipline.
- Familiar with project specifications.
- Familiar with safety and environmental requirement.
- Familiar with reporting system.
Instrumentation Inspector
(Jakarta – Site)
Responsibilities:
- Responsible to QA/QC Coordinator for all construction activity related to Quality Assurance & Quality Control and Ensure that QC Contractor has conduct examination for all instrumentation equipment accord with the approved procedure.
- Responsible for all instrumentation equipment bought by EPC Contractor such as PSV and gas meter has passed the test in the factory and completed with validated document.
- Ensure fabricated gas meter has comply with the AFC Drawing and suit with ITP.
- Coordinate with QC Contractor for gas meter, instrumentation equipment and calibration any equipment related with gas meter.
Requirements:
- Bachelor degree in any major of Engineering.
- Minimum 10 years experience in field instrumentation Migas operation.
- Understand instrument engineering document/drawing : specification, data sheet, wiring/loop diagram, instalation/hook up, P & ID.
- Understand instrumentation testing procedure : calibration, leak test, continuity test, loop test, function test and SA (Surge Arrestor).
- Understand certification procedure including with Migas/BP Migas : metering, PSV.
Drilling Support Engineer
(Site)
Responsibilities:
- Prepare and review drilling rig contract, services and procurement including technical estimation for tender to support drilling operation.
- Arrange cost estimation/calculation for wells drilling and other support facilities, monitor and analyze the drilling operation in order to make it accordance with the budget.
- Monitor drilling operation activity and support drilling program continuity in accordance with the plan.
- Review operation and contract strategy for all operation to get an optimum wells drilling.
- Planning transportation for material & equipment mobilization process in coordination with Drilling Superintendent & Operation Engineer.
- Administration duties for all payments of purchasing activities , operation and material delivery process (PO, WAN, etc).
- Making recapitulation data of all material usage and budget expense of drilling project in coordination with Field Administrator and Operation Engineer.
- Conduct close-out process with Section Head and auditing with internal or external party.
Requirements:
- Bachelor Dgeree in Petroleum, Mechanical, Civil, Chemical, Electrical, and Industrial Engineering.
- Minimum 3 years experience in drilling of oil and gas operation.
- Certified in Drilling Technique.
- Certified PTK 007 BPMIGAS.
Pressure Vessel & Tank Inspector
(Jakarta)
Responsibilities:
- Responsible to QA/QC Coordinator for all construction activity related to Quality Assurance & Quality Control.
- Responsible for all aspect and vessel & tank fabrication phase bought by the contractor including the instrumentation such as PSV, glass level, PCV, etc. has examined at the factory and the Fabricator has complete it with validated document.
- Ensure all fabrication personnel who is responsible for vessel tank fabrication has the authority to accomplish the equipment fabrication.
- Ensure that local fabricator has comply the construction aspect and Migas level aspect.
- Ensure that QC Contractor has examined the equipment in accordance with approved procedure.
- Verify that the contractor has conduct material checking and other necessary test.
- Ensure all welder, welding procedure and testing procedure has been reviewed and approved, also ensure that all personnel certification has accordance with their qualification.
- Ensure all test equipment like pressure & temperature gage, dead weight tester has comply the validated certification.
- Coordinate with field Construction representation to conduct SAT witnessed by Migas official.
- Coordinate with contractor for all documentation aspect related to SKPP & SKPI.
Requirements:
- Bachelor degree in engineering (any major).
- 10 years experience in fabrication inspection & tank hoarder Migas Operation.
- Certified as Pressure Vessel & tank hoarder Inspector from Migas.
- Understand Engineering doc/drawing : specification, data sheet, P & ID.
- Understand testing procedure for Vessel tank hoarder.
- Understand MIGAS/BPMIGAS certification procedure for hydrotest pressure vessel, leak test tank hoarder.
- Experience in checking, testing and equipment installation for pressure vessel and tank hoarder instrumentation such as : flame arrestor, bretaher valve, gas meter, etc.
Electrical Engineer
(Jakarta)
Responsibilities:
- Review and comment EPC deliverables, assist and perform such required independent electrical designs under the direction of the company Electrical Lead Engineer.
- Well known use and operate of the electrical various software application such as ETAP, Chalmlite.
- Inspect electrical device during FAT and SAT.
- Communication with other discipline ( process, instrument, mechanical, piping, civil ) to ensure that the design is properly and meet to COMPANY requirement.
- Well familiar with the provisions of the codes, standards and recommended practices in oil and gas industry such as NEC, API, NFPA, IEC, IP 15 etc.
- Communication with other party i.e. EPC Contractor, BPMIGAS, MIGAS in order to electrical work meet to COMPANY requirement including support obtaining license and certificate from government (MIGAS).
Requirements:
- Bachelor science degree in power system electrical engineering.
- Have experience minimum five (5) years in the electrical design of oil and gas production facilities.
- Well known use and operate of the electrical various software application such as ETAP, Chalmlite.
- Well familiar with the provisions of the codes, standards and recommended practices in oil and gas industry such as NEC, API, NFPA, IEC, IP 15 etc.
Environment Engineer
(Site)
Responsibilities:
- Provide Environmental performance index and practicable periodic Environmental programs.
- Assist HSE Coordinator to control project Environmental programs.
- Capable to define related Environmental regulations requirement regarding project.
- Evaluate existing Environmental policies and procedures or create new policies and procedures.
- Capable to communicate actively to all construction leaders, including contractor s leader to ensure work activities are comply with company and government HSE regulations.
- Provide periodic reporting on programs and activities to HSE Coordinator.
- Provide and exercise Environmental statistical data.
- Capable to provide Environmental data trending analysis.
- Capable to determine any Environmental issue, including to analyze and to propose recommendation.
- Able to use advanced principles of biology, chemistry, and environmental science to protect wildlife and natural resources as well as human life.
- Capable to work on a variety of serious environmental issues, for example: design municipal water supply and industrial wastewater treatment systems; assess recycling and reclamation processes; conduct hazardous waste management studies; and consult on the environmental effects of various construction projects.
- Advise industries and government agencies about efficacy of environmental policies and standards.
Requirements:
- Bachelor degree in Engineering and Environmental science or other related discipline.
- Having minimum 5 years experience in related fields and minimum 1 year in supervisory position.
- Computer literate; Auto-CAD is mandatory.
- Fluent in English.
- Familiar with Health and Safety aspects in oil and gas industries, especially in oil-gas production facilities construction.
- Experience in developing UKL-UPL and AMDAL; Environmental management system will be an advantage.
- Familiar with HSE codes and standards, i.e.: NFPA, API, etc.
- Willing to travel frequently to remote area (outside Java).
Completion Engineer
(Site)
Responsibilities:
- Making database summary of completed drilling project for comparison data to the next drilling program/plan (Offset Well Data).
- Designing well and details of drilling program for a well construction project (onshore & offshore) including all technical/engineering plan, cost estimation, material purchase plan and drilling equipment (Well Construction Program).
- Preparing cost estimation proposal and technically presented the plan to BPMIGAS to get an approval for executing the project (AFE & WP&B).
- Searching and analyze necessary material & equipment to be applied in the drilling project and estimate risk & cost analyst (Technology Scouting).
- Analyze and plan optimalization well design, drilling & completion, and overall budget proposal from the drilling summary result made by Drilling Superintendent.
- Supervise HQ activity, assist Drilling Superintendent to conduct quality control process (QC) during drilling project.
Requirements:
- Bachelor Dgeree in Petroleum, Mechanical, Civil, Chemical, Electrical, and Industrial Engineering.
- Minimum 3 -5 years experience in drilling of oil and gas operation.
- Certified in Drilling Engineering / Operation.
- Certified well control (IWCF – Surface / subsea stack).
- Certified in T-Bosiet (Sea Survival, HUET, Fire Fighting).
Contract Engineer
(Jakarta – Site)
Responsibilities:
- Develop and analyze subcontract documentation (interpretation of contract scope and terms and conditions).
- Provide advice and seek counsel on contractual, commercial, taxation, insurance and legal issues.
- Coordinate subcontracts development, compilation, sourcing, pre-tenders, invitation to tender, evaluations of proposals received including requests for qualifications.
- Post award coordination of Subcontract Variations, including evaluation of Subcontractor s claims and defending claims from Subcontractors.
- Participate in Subcontract audits, reviewing records for accuracy and conformance to standards.
Requirements:
- Bachelor Degree in Engineering any discipline.
- Minimum 10 years professional experience, 5 years Project Contracts experience in EPC projects will be an advantage.
- Certified BP Migas PTK 007 Rev-2 Certification in Supply Chain Management.
- Experience in contract formulation activities, systems and processes coupled with working knowledge of engineering, fabrication and construction practices.
- Good skills in Ms Word and Ms Excel.
Construction Superintendent
(Jakarta – Site)
Responsibilities:
- Responsible to QA/QC Coordinator for all construction activity related to Quality Assurance & Quality Control, including ERW pipe quality, pipe line, fitting pipe and valve.
- Coordinating with pipe factory QC to monitor the ERW pipe quality seamless.
- Responsible to ERW pipe quality or seamless bought from inside and out of country.
- Verify the processing of ERW pipe production from the pipe mill process until it comply the standard and certificate issued by pipe mill from Indonesian factory or pipe material, valve and pipe fitting imported from out of country.
- Ensure that contractor has conducted material checking: pipe line, pipe fitting and leak test valve that bought by EPC Contractor before deliver it to the job site.
Requirements:
- Bachelor Degree in Metallurgy or Mechanical Engineering.
- 10 years experience in pipeline construction.
- Certificated as pipeline inspector.
- Certificated as welding inspector.
- Familiar with standard code ASME, ASTM, ANSI, ANT TC 1A, API, DNV, SNI.
Untuk informasi lebih lanjut silahkan masuk ke website kami di
http://www.id-recruitment.com/tomori
“Only short-listed candidates will be invited via e-mail/phone for Test and Interview”
I wish to be considered for the position of Mechanical / Piping Field Construction Engineer (Sulawesi) or any other that may be suitable see my CV below.
Eric Marshall
15 Malvern Grove, Leeds
West Yorkshire, LS11 8PB
England U.K.
Phone: (044) (0) 79506-71543
murni36trout57@gmail.com
SENIOR PIPING ENGINEER/DESIGNER
Extensive experience that includes Lead Piping Designer, Project Engineer, Senior Design Engineer and Field Engineer positions….extensive international background includes work in Indonesia, Singapore, Iraq, and Abu Dhabi….contributed to the on-time and on-budget success of projects that ranged up to $100 million, maintaining the highest level of quality on all assignments.
* Able to direct, coach, and motivate diverse team members, including local workers in international locations.
* Skilled in coordinating activities among multiple departments/groups and resolving problems quickly.
* Proficient in supervising and completing tasks under highly challenging conditions and environments.
* Expertise in the use, coordination, and set-up of AutoCAD R14 and Rebis per contract requirements.
Key Value-Offered Qualifications
Preparing Piping Construction Work Packs, Requisitions, M.T.O’s, Isometrics, Layouts & Piping/Valve Specifications
Examining and Verifying Engineering Drawings, Documents, GA’s, Isometrics, P & I.D’s, M.T.O’s, and Proposals
Providing Analyses & Recommendations to Project Managers and Executives from Employers and Clients
SELECTED FIELD EXPERIENCE
Liaison Tenant/Active Tenant – Your Housing Group, 2002 to date. (Voluntary work)
Trained as an Inspector to review the workings of our association against that of other associations and to advise management of any changes to be made, to increase the efficiency of our association. Attended various conferences associated with housing and organized our in-house conferences. Sat on the working group to set up a residents board and on the merger between 2 other organisations to form the Your Housing Group. I am now on the Scrutiny Committee that reviews all the parts of the workings of the Group to be more efficient and give a better service to residents.
Returned to the U.K. Sept 2000 and started to look for work from then on.
Lead Piping Designer – PT KVAERNER – Indonesia – 10/1997-6/1998
Coordinated all piping activities involving the West Natuna Gas Compression Module, for Premier Oil Indonesia, training and coaching 4 designers and 2 engineers. Developed piping specifications, piping layouts, isometrics, M.T.O., and material requisitions using AutoCAD R12.
Maintained forward progress despite multiple changes from the client through training/mentoring of local designers and coordination with all other sections to complete tasks on time.
Lead Piping Designer – PT ISTANA KARANG LAUT – Indonesia – 5/1997-10/1997
Prepared layouts and isometrics as part of a Dehydration Skid for Total Indonesie. Evaluated P & ID’s as part of compliance requirements and objectives. Created M.T.O’s and material requisitions using AutoCAD R12 and Rebis.
Completed near-100% of tasks independently with little to zero supervision; ensured full compliance with specifications and P &ID’s.
Continue
Project Engineer – PT SHERLINDO KREASITAMA – Indonesia – 8/1995-4/1997
Managed manpower and block work contract for PLN Power Station of civil contractor PT KMT. Verified hours completed by the client; calculated and distributed payments to the workforce. Examined proposals for projects, compiling and submitting required documents to financiers for investment activities.
Contributed to high level of employee and client satisfaction through accuracy of records and on-time payments for team members, creating summary report in Excel to ensure error-free documentation.
Project Piping Engineer – QUALITY ASSURANCE TECHNICAL SERVICES –Singapore – 2/1994-5/1995
Coordinated and executed numerous M & E contracts in Singapore, functioning as a primary liaison to design teams and contractors. Managed and coordinated site activities for Anchor Point and Seletar Sewage works project. Served as the #2 to an STC main contractor for the Changi Airport Extension project in overseeing all piping work, including CHW and condenser water systems, water reticulation, and sprinkler systems. Tested and balanced pipe work; commissioned capital plant and equipment that included chillers and cooling towers.
Maintained on-time and on-spec completion of pipework and lagging, resulting in full client satisfaction for work completed per program requirements.
Project Piping Engineer – PT PARANADA EKAYASA – Indonesia – 5/1993-1/1994
The work involved the running of the design office using AutoCAD R12 and the on-site coordination for two on-shore gas receiving facilities of total value approx. 5 million US$ for PT McDermott. The work consisted of the P & ID’s, site layouts for all disciplines together with the relevant details, hydrostatic test diagrams, all electrical and instrument diagrams required, structural arrangements and details. The coordination between all disciplines to achieve the milestones set for the contract. Checking the bills of materials against the bulk orders placed and requisitioning the balance. Preparing the vendor data book and the operating and maintenance manual. Obtaining the clients approval for all drawings and vendor data.
Lead Piping Designer – PT KOMARITIM – Indonesia – 1/1992-12/1992
Directed piping design and materials control as Project Engineer for $15 million project in the Jakarta office and Handil construction site. Scrutinized all piping-related drawings and material documents supplied by the client, advising team on material shortage situations. Supervised preparation of shop fabrication drawings and issued drawings as well as material requisitions to the Construction department. Advised PM of all piping change orders.
Ensured achievement of load-out date for the unit by controlling all piping materials to avoid shortages and maintain progress, with zero complaints or issues from the client.
Lead Piping Designer – PT TRIPATRA – Indonesia – 7/1989-12/1991
Led production of P & IDs for ARII gas facility on Pagerungan Island (as well as well sites, gas receiving, and metering on the mainland). Supervised team of 12 local designers. Verified all work, including line list, valve list, and M.T.O. Seconded to ARII as representative in contractor’s design office on design of new platform BZZA, pipelines, and tie-ins to existing platforms, including new vessels and pipe work; identified any problems for the client to resolve at a later date. Oversaw mechanical approval for all drawings, including vessel design and details; reviewed all mechanical equipment and evaluated quotations prior to equipment ordering.
Met objectives in running single pipeline around Java for supply of petrol, diesel, and kerosene with pumping stations and storage facilities as required by the client. Implemented and detailed facilities to meet client requirements; incorporated test points for physical verification of line contents.
Continue
Lead Piping Designer – JOHN BROWN – Portsmouth, U.K. – 5/1989-7/1989
Executed complete Isometric check for I.C.I. Chemical Plant. Subsequently transferred to Indian project.
Integrated new equipment into the existing plant in order to maximize use of existing pipe work within minimum down time.
Piping Designer, Redpath Engineering Services, U.K. Feb 1989 – March 1989.
Checked pipe supports on M30 Platform, positioned support steel work, created M.T.O. for supports and steel work, and completed fabrication sketches.
Piping Designer, Elida Gibbs (Unilever), Leeds, U.K. July1988 – Jan1989.
Completed layout of new pipe work, tanks and front-end engineering for various new and ongoing works. Supervised construction of the works and collaborated with production as to availability of equipment to maintain production.
Field Engineer, MW Kellogg, Baiji, Iraq March 1988 – June 1988.
Worked on the construction of an Ammonia/Urea complex, dealing with the day-to-day engineering problems during construction of the Urea Plant. Executed the mechanical inspection of completed work, preparing the hydrostatic test packages and obtaining the clients acceptance of the tests.
Piping Engineer, Mitchell Cotts Chemicals Ltd., U.K. Oct 1987 – Feb 1988.
Worked on the front-end engineering for various projects, preparing the flow sheets and P & IDs while initiating orders for plant and equipment for the projects.
Piping Engineer, Talham Engineering/Ferguson & Partners Consulting Engineers, U.K. Aug 1987 – Oct 1987
Oversaw complete design of the boiler area of the plant room for the modernization of a London building. Prepared the line diagrams, arrangement and detail drawings, and location drawings for other equipment and agreeing these with the Consulting Engineers people.
Piping Designer, Davy McKee, London, U.K. April 1987 – July 1987.
Designed pipe supports for the off-site pipe work for a project at BP Chemicals, Hull.
Project Design Engineer, Oceaneering (seconded- Amoco Trinidad Oil) Feb 1986 – Oct 1986
Gas Lift and Water Flood Project that necessitated modifications to platforms. Agreed site changes due to errors of various forms, conducted pre-tender meetings and site visits to complete work and other works being handled by the construction department. Raised local purchase orders for hiring of team members and procurement of equipment to carry out urgent works on the platforms and the supervision of the works.
Continue
Research Design Engineer, I.C.I., Billingham, U.K. July 1985 – Feb 1986.
Engaged in the conceptual and detail design of various items of test equipment for the use in the Research department, including specification and ordering of materials, obtaining quotations for the fabrication or supply of equipment and the placing of orders.
Senior Designer, Press Construction, Darlington, U.K. Nov 1984 – July 1985.
Working at I.C.I. Grangemouth on feasibility studies, plant layouts and details for changes to the process plant, including the break-in schedules with details and S.o.W, M.T.O. and changes to the line lists.
Field Engineer, Metal & Pipeline Endurance Ltd. U.K.
Seconded to Occidental Libya. Dec 1983 – April 1984
In – charge of the Mapel Inspectors to ensure the contractor works to the drawings and specification of a small test facility for a pipeline.
Designer, I.C.I. Vessels Section. Billingham England U.K. Oct 1982 – Nov 1983
Worked on Insulation of Columns Layout of fixing positions of blankets and screws. Creating a foam glass covering to cryogenic tanks producing a procedure and sketches for the installation process which has been adopted as a company standard.
Senior Design Engineer, Khalfan Trading Services, Abu Dhabi, Seconded to Abu Dhabi Marine Operating Company (ADMA OPCO) March 1979 – Aug. 1982.
Involved with the following works for Das Island:-
Completing the works on the building of three Horton Spheroids and the associated pipe work attending the weekly progress meetings representing the engineering dept. Producing the technical parts of tenders for the repair of Storage Tanks both fixed roof and floating roof tanks, carrying out the inspection to ascertain the scope of work and prepare a B.O.M. for the work value of contract US$ 5 million. Preparing a diesel tank farm layout with all pipework and metering facilities, preparing the cost estimate and a justification report for the increase to the budget. Maintaining a record of all new projects being proposed or carried out on the Island that involved any sort of pipework i.e. a new fire main round the air strip, a radio mast requested by the military with a diesel generator its location agreed by both parties, a new fresh water tank for the upgraded contractors camp, determining the location of all underground pipe work either in use or redundant.
Senior Design Engineer, Saudi Arabian Parsons Ltd. Dec 1977 – Dec.1978.
Design Liaison between 4 construction sites of ARAMCO and our head office during the construction phase keeping records of all the changes made. The out of Kingdom inspection and acceptance of the fabrications being carried out in Dubai (UAE). Set up a test rig and workshop for old unused valves to check they are still serviceable and fit for use.
Continue
Designer to Engineer, Test & Inspection Engineer, Inspector/Expeditor
William Press & Son Ltd. May 1967 – Nov 1977
Tank Farm Layout, tank design and plate layout, piping and support design.
Chemical plant equipment design & layout, piping layout, P & ID’s updating, M.T.O. of equipment.
Design of a moving system for rig manufacture and fit out. Design of a lifting system for electrodes into a lathe for dressing for reuse in a steel furnace. Revamp and change of use of a dangerous chemical plant to one of less hazardous use, marking out and listing the work required for the removal and replacement of pipework. Pipe support design for a power station, all sketches and B.O.M required.
Sent to site to design and change drawings to As-Built status, design site changes as required by client.
Put together a manual of spare parts for all items of equipment from filters, valves, pumps, turbines vessels, tanks etc. and creating a list of spares for a life cycle of 5, 10 & 20 years.
Inspection of erected pipework and make ready for testing and flushing, preparing of test pack for presentation to client for acceptance. Visiting manufactures to inspect and expedite orders i.e. valves and fittings mainly.
Plus many other jobs as required by management.
Staff Design Draughtsman. British Titan Products Ltd. U.K. Aug. 1962 – May 1966
Dealing with maintenance, upgrade and new works for the production of Titanium Dioxide by 2 different processes and development work.
Staff Draughtsman. Dorman Long (Steel) Ltd. U.K. Jan 1960 – Aug 1962
General draughting for the production of Iron & Steel.
Radar Mechanic. Royal Air Force National Service. Jan 1958 – Jan 1960 U.K.
Apprenticeship: Mechanical Engineering Draughtsman Dorman Long (Steel) Ltd England U.K.
Apprenticeship: Fitter & Turner Dorman Long (Steel) Ltd England U.K.
EDUCATION & CREDENTIALS
Ordinary National Certificate (ONC) & Higher National Certificate (HNC)
Constantine Technical College – Middlesbrough, England
Professional Training: Fitter & Turner Apprenticeship; Mechanical Engineering Draftsman Apprenticeship
Professional Affiliations: Engineering Council Registered; Associate Member, The Institute of Mechanical Incorporated Engineers; Engineering Associate, The Society of Engineers.