PT McDERMOTT INDONESIA
BATAM
The biggest offshore fabricator in Indonesia and one of the largest offshore construction companies in the world requires proficient, efficient, and highly motivated individuals for the following position:
PRODUCTION ENGINEERS
- STRUCTURAL (PE-S)
- PIPING (PE-P)
- INSTRUMENT (PE-1)
- MECHANICAL (PE-M)
- ELECTRICAL (PE-E)
- Review and approve project drawings and specifications
- Prepare field instructions, material purchase lists, construction punch lists, etc
- Resolve fabrication problems with the fabrication personnel, engineering office, vendors and clients, etc
- Monitor and report the project progress.
- Engineering degree from a reputable University
- Engineers with experience in the construction business of the oil & gas industry are preferred, however relevant experience in the shipbuilding and petrochemical industries will also be considered
- Applicants without engineering degrees but with 5 years of relevant experience may also apply ■ Proficient in oral and written English
- Willing to work in a fabrication /construction environment.
If your vision of a work environment includes the challenges which can lead to personal growth, respect for ideas, and colleagues who rank with the best, then please send your application and resume, quoting job code, with copy of qualification certificates and recent photograph (4x6cm) to:
HR DEPARTMENT
PT. McDERMOTT INDONESIA
Jalan Bawal – Batu Ampar – Batam 29452
Email: hrd.batam@mcdermott.com
sarman fernando
botania garden b8 no.12a
081364977800/081364623352
PT.JSE,PT.GOLTENS JAKARTA
maaf bapak/ibu
saya lulusan smk listrik , apakah saya bisa bekerja di PT mc dermot. apabila bisa saya bersedia untuk mengikuti prosedur melamar pekerjaan
For your consideretion : MPT/LPT ASNT Level II from
I Have Experienced More 5 years in fabrication and contruction ( perssure Vessel, Module, piping structure, boiler, tankage, and pipiline, pipelay, I very familiar with Welding Process, quality Procedure,mechanical test, WPS,PQR, DT & NDT Technique, Welding Symbol, Codes & Rules ( BS EN,AWS D1.1, ASME V, ASME IX, ASME B31.3, API 1104, API 650 ,API 5L, API 5CT, ASME VIII ASME II). I can work well as a part of team as good as working under pressure. It will be challenging if I can join your company and I wish to apply for vacant position.
Hereby enclosed CV and supporting particulars in attachment. Hopefully my qualification and experienced can meet to your minimum requirements and look forward for your good new and interview.
CURRICULUM VITAE
Update, 24 April 2011
PERSONAL DETAILS
Full Name : Dian Permana
Place of Birth : Bandung,West Java
Date of Birth : September 8, 1982
Gender : Male
Religion : Moslem
Marital Status : Married
Nationality : Indonesian
Telp./hp: : ( 085715080191 / 085210325580 )
Email : * dp ret2@yahoo.co.id
* dp ret@yahoo.com
FORMAL EDUCATION
Univesity : Politeknik Negeri Jakarta
Faculty : Faculty of Mechanical Engineering
Departement : Mechanical Engineering
Student ID : 120201035Y
Degree : Ahli Madya
Graduated on : September 8,2005
SUMMARY OF QUALIFICATION
• ASNT NDT Level II in Liquid Penetrant Testing
(Re-certificate No.: CQ/IDS-023 Valid Until January 2014)
• ASNT NDT Level II in Magnetic Particle Testing
(Re-certificate No.: CQ/IDS-023 Valid Until January 2014)
• ASNT NDT Level II in Ultrasonic Testing
(Re-certificate No.: CQ/IDS-023 Valid Until January 2014)
• ASNT NDT Level II in Radiography Testing
(certificate No.: CQ/IDS-023 Valid Until January 2010)
PROJECT ASSIGNMENT
• Project Name :
– MAINTENANCE TOTAL E&P INDONESIE
Constumer : TOTAL E&P INDONESIE
Subcontractor : PT.Shahib Sejati
Location : Handil Yard & Site, Balikpapan-East Kalimantan
Job description : Conduct Magnetic ParticleTest and Penetrant Test
Time Commenced : June 2010 – present
• Project Name :
– TATUN Well Connection package # B
– Sisi Nubi Well Connection
– TATUN Well Connection TN. Ix 34/35/39/53
– Handil 12”M2 PIPELINE RIVER CROSSING
– PECIKO 7A Yard
– PECIKO 7B Yard
– Tunu phase 12 Well Connections Project
– Tunu phase 11S EPSC-3 Offsite Project
– Tunu phase 11N EPSC-13 Offsite Project
– Tunu phase 11S EPSC-7 ETIP Project
– Tatun Oily Water Treatment EPSC 1/Phase 1
Constumer : PT.Meindo Elang Indah
Employer : PT.Shahib Sejati
Location : Handil Yard & Site, Balikpapan-East Kalimantan
Job description : Conduct Ultrasonic testing, Magnetic ParticleTest and Penetrant Test
Time Commenced : Apr 2007- May 2010
• Project Name : – Tunu phase 12 EPSC1 ( GTS Bx-Fx-Nx )
– Tunu phase 13A EPSC1 ( GTS Gx-Mx)
Constumer : PT.KALIRAYASARI
Employer : PT.Shahib Sejati
Location : Handil Yard & Site, Balikpapan-East Kalimantan
Job description : Conduct Ultrasonic testing, Magnetic ParticleTest and Penetrant Test
Time Commenced : Augt 2008 – April 2010
• Project Name : – PECIKO 6 SENIPAH
Constumer : PT.Gunanusa Utama Fabricator
Employer : PT.Shahib Sejati
Location : Senipah Yard, Balipapan-East Kalimantan
Job description : Conduct Ultrasonic testing
Time Commenced : Apr 2009- Nov 2009
• Project Name : In-Shop Pressure Vessel Fabrication
In-Shop Boilers and Pressure Vessel Fabrication
Constumer : PT.MMC Metal Fabricator
PT.Boustead Maxitherm Industries
Employer : PT.Shahib Sejati
Location : Cikarang
Job description : Conduct Ultrasonic testing, Magnetic ParticleTest and Penetrant Test
Time Commenced : Apr 2007- June 2007
• Project Name : In-Shop Maintenance services for Piping and Pressure Vessel
Constumer : PT.Bureau Veritas Indonesia on behalf of Schlumberger indonesia
Employer : PT.Shahib Sejati
Location : Pulogadung, Jakarta
Job description : Conduct Ultrasonic testing, Magnetic ParticleTest and Penetrant Test
Time Commenced : March 2007
• Project Name : In 20 70 tank, Total E & P Indonesie-Senipah
Constumer : PT.Dimensi Barumas Perdana
Employer : PT.Shahib Sejati
Location : Senipah- East Kalimantan
Job description : Conduct Magnetic ParticleTest and Penetrant Test
Time Commenced : October 28- November 7, 2006
• Project Name : TOTAL Sisinubi Field Development Project Phase1 SN 1/EPSC 1
Constumer : PT.Gunanusa Utama Fabricator
Employer : PT.Shahib Sejati
Location : Grenyang, Cilegon
Job description : Conduct Magnetic ParticleTest and Penetrant Test
Time Commenced : January 2006- October 2006
• Project Name : TOTAL Sisinubi Field Development Project Phase1 SN 1/EPSC 1
Constumer : PT.Gunanusa Utama Fabricator
Employer : PT.Shahib Sejati
Location : Grenyang, Cilegon
Job description : Conduct Magnetic ParticleTest and Penetrant Test on The Job Training
Time Commenced : November 2005- December 2005
RIWAYAT HIDUP
Nama:abdul munap
saya brpengalaman di bidang piping.saya sangat berharap bisa bergabung lagi kerja di PT.MC DERMOOT,
posision:fitter piping
ttgl:pacuan ,10-10-1983
agama:muslim
tempat tinggal sekarang: batam
kebangsaan :indonesia
sangat berharap bisa bergabung kembali dengan MC DERMOOT, IND. (3154)
no telp. 081990840379
imeil: a.dul31@yahoo.com